Heavy Duty Feet 2
Heavy Duty FootWire-container-heavy-duty-feet-runnersWire-container-with-runnersWire Basket with Heavy Duty Feet with Steel Runners & GussetWire Basket with Heavy Duty Foot and Steel RunnerWire Basket With heavy duty feet and 2 way runners IISuper Heavy Duty FootSuper Heavy Duty FeetExtra Heavy Duty Feet

Heavy Duty Feet for Wire Containers

Heavy Duty Foot. New. The price includes (4)- Heavy duty feet per basket. Weight: 2.5 LBS each. Part Number: -HDF

*Heavy duty feet are a custom option and are factory installed when wire container is manufactured. Heavy duty feet are not sold separately, they must be purchased with the wire basket. Wire containers sold separately.

NOTES: Custom wire containers have an 8-10 week lead time. Ships best way pre-paid & add. Freight Class 70. FOB: Chicago, IL 60446, Atlanta, GA 30297, Dallas, TX 75228 and Los Angeles, CA 92408

Lower Prices for Larger Quantities
SKU: -HDF. Category: .

Wire Containers can have optional heavy duty foot (and can also include a steel gusset) added to increase durability and reduce damage done by forklifts. This option can add years to the life span of your wire baskets.

The feet are the most vulnerable part of a wire basket. To help reduce damage we recommend you add custom heavy duty feet option which can also include steel gusset and runners as seen in picture.

Heavy duty feet for wire containers keep the feet rigid and prevents them from twisting or breaking when they get hit by the forks of a forklift. Heavy duty wire basket feet can also have steel runners but steel runners are not necessary. The heavy duty feet option can add many years to the lifespan of your wire basket.

**SPECIAL NOTES: INTRODUCING OUR NEW EXTRA HEAVY DUTY FEET (SEE PICTURE BELOW) THAT ARE .236″ THICK WITH STEEL GUSSETS. WE HAD A CUSTOMER RECENTLY PAY THE $1000.00 TOOLING CHARGE FOR THESE NEW EXTRA HEAVY DUTY FEET THAT HELP RESIST FORKLIFT DAMAGE TO THE MOST SUSCEPTIBLE PART OF THE BASKET – THE FEET. IF YOU ARE INTERSTED IN THIS CUSTOM OPTION JUST ASK. NOTE: ALL HEAVY DUTY FEET ADD 9-10 WEEK LEAD TIME.